Scheer PAS Integration iPaaS Case Study Example dodenhof 2 Retail

Customer

dodenhof

Project

Integration

Description of the customer

From a small shop in 1910, dodenhof has developed into northern Germany's largest shopping centre with over 125,000 m² of retail space in Posthausen, Lower Saxony. The company has expanded further with a second location in Kaltenkirchen near Hamburg. When the 4th generation of the dodenhof family, the company has always been committed to the needs of its visitors throughout its long retail tradition. This commitment has resulted in a fascinating range of products in the dodenhof Shopping worlds ranging from fashion to sport and technology to gourmet items.

Challenges

  • Outdated, extremely heterogeneous application landscape
  • Insufficiently documented point-to-point connections
  • Lack of standardisation in the ERP environment
Case study | dodenhof

Up to 70% time savings when integrating new IT systems

The largest shopping centre in northern Germany has been using Scheer PAS since 2014 to manage its IT landscape in an agile and flexible manner. Over time, the company has achieved a level of integration that is leading in the retail sector. Scheer PAS serves as the central architectural element that offers dodenhof maximum flexibility for future challenges.

Scheer PAS solution

IT modernisation without risks

Old and new systems could be accessed in parallel via a common interface. This allowed the interaction of all components to be extensively tested in advance using so-called double transactions.

Our task: to enable dodenhof to integrate all IT systems (new or old) without taking the risk of a big-bang modernisation, while reducing downtime between the shutdown of old systems and the installation of new applications.

Case study

Interested in more details?

Just fill the form and unlock the knowledge